GWR Broadway Extension Pictures
Links
Back to main site
Nigel Black's P.Way Gallery
Paul Fuller's P.Way gallery
Fotopic.Net
Top Photographs of All Time
1
Information board telling the public the bridge is to be put back in 2008. It was removed by Transco to gain access to the gas station with large lorries, their successor National Grid will pay for the replacement.
Track laying 2 December 2007
(1127)
2
Laverton bridge deck - this won't be resused. Instead a new concrete bridge will be put in.
Track laying 2 December 2007
(1052)
3
The gap with the missing bridge.
Track laying 2 December 2007
(1015)
4
Only 7 and 1/2 miles to Honeybourne. Just over 1/4 mile to Laverton. The bridge deck is just about visible in the distance. A 12 coach run round loop will be built south of the bridge.
Track laying 2 December 2007
(986)
5
Station Road bridge with ballast removed
Broadway Station Site Clearance Work June 07
(869)
Most Recent Collections
28th Jun 2009
Meldon Viaduct and Oakhampton
8th Mar 2009
Relaying Toddington North
2nd Dec 2007
Track laying 2 December 2007
17th Nov 2007
17 November 2007 Track Laying
13th Oct 2007
Clearance work 13 October 2007
18th Aug 2007
18 August Track laying
14th Jul 2007
Track Laying at Stanton 14 July 2007
30th Jun 2007
Broadway Station Site Clearance Work June 07
9th Jun 2007
9 June 07 Track laying at Stanton
3rd Jun 2007
Stanton track laying 3 June 2007
[
More collections
]
Adverts
More pictures at
Nigel's galleries,
and
Paul's galleries
. Return to
main site
.
© Andy Manley
Gallery hosted by
Fotopic.Net
- get your own photo gallery now!
08961